Plus what LA’s permit data says it’s actually producing
You’ve seen “PER SB9” on permits. Here’s what it actually means, and why it’s turning single-family lots into two-job (sometimes four-job) sites.
SB 9 in one sentence
SB 9 lets the owner of a single-family lot in California build two homes on it, split it into two lots, or both, and the city has to approve it without a public hearing if it meets the rules.
Senator Toni Atkins wrote it, it took effect January 1, 2022, and it lives in Government Code sections 65852.21 (two units) and 66411.7 (lot splits).
The two moves
1. Two-unit development. Two primary homes on one single-family lot, attached (a duplex) or detached. In LA, these go to LADBS for plan check like any other building permit.
2. Urban lot split. Cut one lot into two. Each new lot has to be at least 1,200 sq ft, and the smaller one has to be at least 40% of the original. A lot can only be split once under SB 9. In LA, lot splits go through City Planning.
Stack them and you get up to two homes on each of two lots. Cities don’t have to allow more than four units total on the original lot, counting ADUs and JADUs.
The rules that matter on the jobsite
- 800 sq ft floor. Local rules can’t block two homes of at least 800 sq ft each.
- 4-foot side and rear setbacks, max. Rebuild on an existing footprint and no new setback applies.
- Parking: one space per unit at most, and zero if the lot is within half a mile of high-quality transit or one block of a car share.
- No Airbnbs. Units can’t be rented for 30 days or less.
- Live there (lot splits). The owner signs an affidavit to live in one of the units for three years.
- Not everywhere. Historic landmarks, most very high fire hazard zones, wetlands, flood zones and homes with rent-controlled or recently tenant-occupied units are out. LA owners can check their lot on ZIMAS under “SB 9 Eligibility.”
What’s changed since 2022
SB 450 (effective Jan 1, 2025): Cities have to approve or deny a complete SB 9 application within 60 days, or it’s deemed approved. They also can’t hit SB 9 projects with design standards that don’t apply to everything else in the zone.
AB 1061 (effective Jan 1, 2026): Being in a historic district no longer kills an SB 9 project by default. Now it’s mostly blocked only if the lot has a “contributing” historic structure, or if a lot split would demolish or alter one.
The court fight: In April 2024 an LA judge ruled SB 9 couldn’t be applied to five charter cities (Redondo Beach, Carson, Torrance, Whittier, Del Mar). In November 2025 the Court of Appeal reversed that ruling and sent the case back. For now SB 9 applies statewide, but the constitutional question isn’t fully settled.
What didn’t pass: AB 2005, which would have let owners skip the live-in requirement if they sold both lots, died when the Legislature adjourned August 31, 2026.
So is anyone actually using it in LA?
Yes, and a lot more than in year one.

LA permits that cite SB 9 in the work description, by 12-month window (Oct to Sep):
- 2021-22: 9
- 2022-23: 171
- 2023-24: 393
- 2024-25: 646
- 2025-26: 655
That’s 1,874 SB 9 permits since the first one was issued in June 2022. The last 12 months carried $123.9M in declared value, with a median permit of $150,000.
What the work actually is

Of the last 12 months’ 655 SB 9 permits:
- 313 were new buildings
- 235 were additions
- 82 were alterations or repairs
- 19 were grading permits
The new SB 9 buildings had a median size of 1,600 sq ft and a median declared value of $200,000. And 240 of the 655 permits also added an ADU. That’s the four-units-on-a-lot math in action.
For scale: SB 9 new builds were 313 of 4,151 new 1-2 family building permits in LA over the same 12 months. About 1 in every 13.
It’s a Valley thing

The top SB 9 areas over the last 12 months:
- Canoga Park-Woodland Hills: 95
- Reseda-West Van Nuys: 73
- Van Nuys-North Sherman Oaks: 60
- Sun Valley-La Tuna Canyon: 52
- North Hollywood-Valley Village: 46
- Arleta-Pacoima: 39
Big flat single-family lots are lot-split country. Hollywood had 3. Venice had 2.
Why trades should care
An SB 9 project is a small builder or a homeowner turning one house into two, three or four. That’s a new foundation, framing, a second electrical service, plumbing, roofing, HVAC, drywall, tile, cabinets and paint, often all on the same lot as an ADU going up next to it.
These aren’t towers with locked-in GCs. They’re small jobs run by owners and small builders who are still hiring subs after the permit’s issued.
Get the list
BCAR DATA pulls every LA permit into a monthly lead list you can filter by area and project type, SB 9 and ADUs included. The Los Angeles lead list is at bcardata.com.
Law sources: California HCD SB 9 Fact Sheet (Sept 2024); LADBS “Senate Bill 9: Two-Unit Development and Urban Lot Split” page; LA County Planning SB 9/SB 450 memo (March 2026); Burke, Williams & Sorensen on SB 450 and AB 1061; City of Redondo Beach v. Bonta, Court of Appeal B338990 (Nov 12, 2025); Larchmont Buzz on AB 2005 (Sept 1, 2026). This is a plain-English summary, not legal advice; check eligibility with your city. Permit data: City of Los Angeles Department of Building and Safety, Building Permits Issued from 2020 to Present (export dated October 7, 2026). SB 9 permit = work description mentions SB 9 (e.g. “PER SB9”); supplemental permits excluded. 12-month windows end September 30. Areas are community plan areas. Declared value is what the applicant reports to the city, not the final construction cost.