NYC in September 2026 : Same Number of Permits, Way Bigger Jobs

By October 28th, 2026No Comments

Monthly City Recap: New York City, September 2026

New York’s permit count barely moved in September. The money behind those permits moved a lot.

The Department of Buildings issued 8,257 new work permits in September 2026 through DOB NOW: Build. That’s up 3% from 8,043 a year ago and a little ahead of August’s 8,114. The estimated job cost on those permits came to $2.07 billion, up 22% from $1.70 billion last September.

Same pace at the permit counter, much bigger checks behind it. Here’s where the money went and what’s getting built.

The big number: 8,257

8,257 is a solid September, but not a record. New permits topped out at 9,076 in June, and February was the low point at 6,097. NYC’s year follows the weather: slow in winter, busy from spring on.

The bigger shift is in job size:

  • 341 jobs with an estimated cost of $1 million or more, up from 260 last September.
  • 34 jobs of $10 million or more, up from 26.
  • The median job was $27,617, about where it was a year ago ($27,000).

Small jobs are holding steady while big ones pile up. That’s a pattern you’ll see again below.

One more number: on top of the new permits, contractors filed 4,956 permit renewals in September, up from 4,181 a year ago. Renewals keep long jobs legal as they drag on, so more of them usually means more big projects still under way.

What NYC permitted

DOB tags each permit by work type, and one permit can carry more than one:

  • General construction: 2,545 permits. Interior renovations, office build-outs, apartment gut jobs.
  • Plumbing: 1,456.
  • Mechanical / HVAC: 1,098.
  • Structural: 788.
  • Sidewalk sheds: 525. Yes, the scaffolding tunnels. Still 525 new ones in one month.
  • Sprinklers: 516.
  • Solar: 421, down from 641 last September. More on that in our 12-month recap.
  • Foundation: 405, up from 304 a year ago.
  • Earth work: 225, up from 173.

Those last two matter. Foundation and earth work permits come before anything goes vertical. A 33% jump in foundation permits from last September means more holes in the ground now and more buildings going up next.

Where it happened

Manhattan dominated: 3,208 permits and $1.26 billion in estimated job cost, about 61% of the city’s total. Brooklyn followed with 2,013 permits and $416.5 million, then Queens (1,713 / $183.0 million), the Bronx (768 / $169.0 million) and Staten Island (555 / $45.1 million).

By neighborhood, Midtown-Times Square wasn’t close: 562 permits and $460.4 million. That’s more than double the next busiest area, Upper East Side-Carnegie Hill (243).

The jobs behind the dollars

522 Fifth Avenue (Midtown). The biggest office story of the month. Eleven separate filings worth $125.4 million went through in September for interior build-outs and new mechanical systems: offices, support spaces and amenity floors.

175 3rd Street (Gowanus). The single biggest permit of the month: $70.5 million for a new 27-story mixed-use building. It’s another tower for Gowanus, which was rezoned for housing in 2021.

740 Third Avenue (East Midtown). In June, SL Green filed to convert this 34-story office tower into mixed-use residential, a $98.2 million job. In September the trades came in: five filings worth $60.8 million, led by a $27.4 million HVAC system and $16.1 million of new plumbing.

2 Penn Plaza (Midtown South). Vornado pulled a $49.4 million permit for new lobby and office interiors.

Schools and campuses. The School Construction Authority filed $46.9 million at 400 Pennsylvania Ave in East New York (new roof, doors, windows), and CUNY filed $28 million to renovate two floors at 29-10 Thomson Ave in Long Island City. The Met Museum also pulled a $26.2 million permit to replace its south side chiller plant.

The takeaway

The number of permits held flat. The size of the jobs did not. New York’s September was about large offices getting rebuilt, at least one office tower turning into apartments, and more foundation work starting in Brooklyn and beyond. The next wave of buildings is in the ground now.

The NYC lead list is available to purchase at bcardata.com.


Source: NYC Department of Buildings, DOB NOW: Build – Approved Permits (NYC Open Data), export dated October 13, 2026. Counts are new (initial) work permits by issue date, September 1-30, 2026, one per permit number; renewals are counted separately. Estimated job cost is the applicant’s estimate for the whole job filing, counted once per filing. DOB NOW: Build does not include electrical or elevator permits, which DOB tracks in separate systems. Neighborhoods are NYC 2020 Neighborhood Tabulation Areas.