A year of New York City building permits, October 2025 to September 2026

New York didn’t issue more permits this past year. It issued much bigger ones.

From October 2025 through September 2026, the Department of Buildings issued 94,912 new work permits through DOB NOW: Build. That’s basically flat with the year before (95,228). But the estimated job cost on those permits jumped to $23.8 billion, up 26% from $18.8 billion.

Three stories explain most of it: offices turning into apartments, a wave of groundwork for new buildings, and a solar market that fell off a cliff in January.

The money: $23.8 billion

The big jobs drove the year:

  • 292 jobs with an estimated cost of $10 million or more, up from 216 the year before (+35%).
  • 3,348 jobs of $1 million or more, up from 2,849.
  • The median job was $26,240, close to last year’s $25,518.

So the typical job barely changed. What changed was the number of very large ones.

June 2026 was the biggest month at $3.04 billion. There’s a clear reason for that, and it’s the next section.

The largest filings of the year:

  • 343 Madison Ave (Midtown): $654 million for a new commercial high-rise, permitted in October 2025.
  • Arthur Ashe Stadium (Flushing Meadows-Corona Park): $575.1 million for USTA renovations.
  • Battery Park City: 25 filings worth $644.3 million from the Battery Park City Authority, for its resiliency project, including new flood walls and barriers.
  • Rodman’s Neck (Bronx): $296.8 million in storm drainage, sewer and water work by the city’s Department of Design and Construction.
  • 375 Madison Ave: $217.9 million for a new curtain-wall facade for JPMorgan Chase.
  • 97 Barclay St: $209 million for a facade replacement for the Bank of New York.

Offices are turning into homes

We counted job filings whose descriptions say they convert office or commercial space to residential. In the last 12 months there were 89 of them across 78 buildings, worth $1.24 billion. The year before: 50 filings and $488 million.

Then there’s June. 32 conversion filings worth $709.9 million landed in that one month. That’s the deadline at work. Under the city’s 467-m tax break, office conversions that started construction by June 30, 2026 locked in the longest benefit, 35 years. Projects that start later get 30 years. Developers moved fast.

The biggest conversion filings:

  • 740 Third Ave: $98.2 million to convert a 34-story office tower to mixed-use residential.
  • 100 William St: $88.8 million.
  • 1730 Broadway: $82.1 million.
  • 30 Broad St: $67.75 million to convert and enlarge.
  • 1005 First Ave: $66.2 million.

The Financial District led with 17 buildings, followed by Midtown-Times Square (8), East Midtown-Turtle Bay (6) and Murray Hill-Kips Bay (6). Four of the FiDi buildings sit on one short stretch of Broadway: 32, 39, 42 and 45 Broadway.

Conversions are long, trade-heavy jobs: new plumbing risers, new HVAC, new kitchens and baths on every floor. They’ll be on the city’s job sites for years.

Groundwork up, solar down

Compared with the year before, the permits that come before a new building rose sharply:

  • Excavation support: 1,071 permits, +34%
  • Earth work: 2,299, +24%
  • Foundation: 4,160, +21%
  • Full demolition: 1,233, +16%

Demolition, excavation and foundations are the start of a new building. More of them now means more buildings going up over the next couple of years.

Then there’s solar. NYC issued 5,648 solar permits, down 33% from 8,450. The drop happened all at once. October 2025 had 906 solar permits, the year’s high. By February there were 315. From January through September 2026, NYC averaged 376 solar permits a month, compared with 675 in the same months of 2025.

The timing lines up with the federal 25D residential solar tax credit, which ended for systems installed after December 31, 2025. October’s spike looks like a last-minute rush, and demand dropped sharply once the credit was gone.

One more: sidewalk shed permits fell 8%, to 5,954. They’re still everywhere.

Borough by borough

  • Manhattan: 36,914 permits, $13.73 billion
  • Brooklyn: 24,339 permits, $3.93 billion
  • Queens: 18,488 permits, $3.64 billion
  • Bronx: 9,358 permits, $1.93 billion
  • Staten Island: 5,813 permits, $523 million

Manhattan accounted for 58% of the dollars, and it grew the most, up from $10.37 billion the year before.

The takeaway

Permit counts stayed flat, but NYC’s construction year was big. Office conversions rushed to beat a tax deadline, more foundations went in for new buildings, and rooftop solar lost its federal credit. If you work in plumbing, HVAC or interiors in Manhattan, the conversion pipeline is the story to watch.

The NYC lead list is available to purchase at bcardata.com.


Source: NYC Department of Buildings, DOB NOW: Build – Approved Permits (NYC Open Data), export dated October 13, 2026. Counts are new (initial) work permits by issue date, October 2025 to September 2026, compared with October 2024 to September 2025, one per permit number; renewals excluded. Estimated job cost is the applicant’s estimate for the whole job filing, counted once, in the month of the filing’s first permit. Conversions are identified from job descriptions. DOB NOW: Build does not include electrical or elevator permits. 467-m deadlines: NYC Department of Housing Preservation and Development program rules. 25D credit end date: Solar Energy Industries Association.